In May 2007, Technip was awarded a turnkey contract by Total Exploration & Production Nigeria Ltd for the loadout, transport and installation of the topsides of the OFP2 fixed platform on the Ofon field. 19 July 2007, Nigerian National Petroleum Corporation (NNPC) and Total, through its subsidiary Elf Petroleum Nigeria Limited, announced the launch of the Phase 2 of Ofon Field Development Project. The new phase of the field development project will eliminate gas flaring in Ofon, in line with the policy of the Federal Government of Nigeria, and give support to the NNPC/EPNL Joint Venture meeting its gas commitments. Gas will be monetised through the NLNG plant. In addition, all produced water will be reinjected into the reservoir. Akmos Global Services has.been responsible for the supply of maintenance spare parts for the Ofon platform, which is offshore. Aibel is working on the design of five new platforms, major modification of three existing platforms and required pipelines and cables. In addition Aibel is conducting preparatory work for long lead equipment and EPC contracts. In October 2011, Saipem was awarded the contract to provide EPC, fabrication and installation of the OFP2 jacket and a living quarter platform for phase 2.
机译:2007年5月,Technip被尼日利亚Total Exploration&Production尼日利亚有限公司授予总承包合同,以在Ofon油田上进行OFP2固定平台的上层装载,运输和安装。 2007年7月19日,尼日利亚国家石油公司(NNPC)和道达尔通过其子公司Elf Petroleum Nigeria Limited宣布启动Ofon油田开发项目的第二阶段。根据尼日利亚联邦政府的政策,油田开发项目的新阶段将消除Ofon的天然气燃烧,并支持NNPC / EPNL合资企业履行其天然气承诺。天然气将通过NLNG工厂货币化。此外,所有采出水将重新注入水库。 Akmos全球服务部负责为离岸的Ofon平台提供维护备件。 Aibel正在设计五个新平台,对三个现有平台进行重大修改以及所需的管线和电缆。此外,Aibel正在为长铅设备和EPC合同进行准备工作。 2011年10月,Saipem赢得了为第二阶段提供EPC,OFP2夹克的制造和安装以及一个生活区平台的合同。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号