...
首页> 外文期刊>Oil and Gas Investor >List of deferred upstream oil, gas projects grows
【24h】

List of deferred upstream oil, gas projects grows

机译:递延上游石油,天然气项目清单增加

获取原文
获取原文并翻译 | 示例
           

摘要

Lingering low oil prices, among other factors, have caused oil and gas producers to hit the brakes on 68 upstream projects, mostly in the deepwater, with a combined capex of $380 billion, leaving billions of barrels of hydrocarbons in the ground, according to analysis from an energy consultancy. "The impact of lower oil prices on company plans has been brutal," said Angus Rodger, principal analyst of upstream research for Wood Mackenzie.
机译:持续的低油价等因素导致石油和天然气生产商在68个上游项目(主要是在深水项目)中刹车,总资本支出为3800亿美元,使数十亿桶的碳氢化合物留在地下来自能源咨询公司。 Wood Mackenzie上游研究首席分析师安格斯·罗杰(Angus Rodger)表示:“油价下跌对公司计划的影响是残酷的。”

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号