Development of the Kupe joint venture is moving forward with the project shifting into the front-end engineering design (FEED) phase.Operator Origin Energy (50%) has commissioned Worley to define the engineering parameters that will be used for construction of the offshore platform,pipeline to shore and gas processing facility.
展开▼