...
首页> 外文期刊>Russia & CIS Metals & Mining Weekly >RUSAL, RUSHYDRO TO SLASH CONSTRUCTION COSTS AT BOCUCHANY HYDRO 40 percent
【24h】

RUSAL, RUSHYDRO TO SLASH CONSTRUCTION COSTS AT BOCUCHANY HYDRO 40 percent

机译:俄罗斯,俄罗斯联邦对布坎恰伊水力发电的打击有可能拖累建筑成本40%

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

UC Russian Aluminum (RUSAL) and RusHydro will cut expenditures on construction work and equipment at the Boguchany Hydro-power Plant by 40 percent in 2009-2010, saving about 8 billion rubles. RUSAL made the proposal to cut costs at a meeting with government officials on March 2, and this suggestion was supported by representatives of RusHydro, a source familiar with the progress of these companies' Boguchany Energy & Metallurgical Association (BEMO) project told Interfax. Costs must be reviewed in light of the situation brought on by the global financial crisis, he said.
机译:俄罗斯联合铝业公司(RUSAL)和RusHydro将在2009-2010年将Boguchany水力发电厂的建筑工程和设备支出削减40%,节省约80亿卢布。 RUSAL在3月2日与政府官员的会议上提出了削减成本的建议,该建议得到了RusHydro的代表的支持。他说,必须根据全球金融危机带来的情况来审查成本。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号