首页> 外文期刊>Biological Conservation >Replacement cost: A practical measure of site value for cost-effective reserve planning
【24h】

Replacement cost: A practical measure of site value for cost-effective reserve planning

机译:重置成本:用于成本有效的储备计划的场地价值的实用度量

获取原文
获取原文并翻译 | 示例
       

摘要

Conservation needs are often in direct competition with other forms of land-use, and therefore protection of biodiversity must be cost-efficient. While common reserve selection algorithms address this problem, quantitative planning tools often suggestan optimal set of sites that is not necessarily convenient for practical conservation. Besides cost-effective solutions we require flexibility if land-use conflicts are to be effectively resolved. We introduce a novel concept for site value in quantitative reserve planning. Replacement cost refers to the loss in solution value given that the optimal cost-efficient solution cannot be protected and alternative solutions, with particular sites forcibly included or excluded, are needed. This cost can be defined either in terms of loss of biological value or in terms of extra economic cost, and it has clear mathematical definitions in the context of benefit-function-based reserve planning. A main difference with the much-used concept of irreplaceability isthat the latter tells about the likelihood of needing a site for achieving a particular conservation target. Instead, replacement cost tells us at what cost (biological or economic) can we exclude (or include) a site from the reserve network. Here, we illustrate the concept with hypothetical examples and show that replacement-cost analysis should prove useful in an interactive planning process, improving our understanding of the importance of a site for cost-efficient conservation.
机译:保护需求往往与其他形式的土地使用直接竞争,因此保护生物多样性必须具有成本效益。尽管常见的储量选择算法解决了这个问题,但是定量规划工具通常会建议一个最佳的地点集,而这对于实际的保护并不一定很方便。除了具有成本效益的解决方案之外,如果要有效解决土地使用冲突,我们还需要灵活性。我们在定量储量规划中引入了一种新的地价概念。替换成本是指解决方案价值的损失,因为无法保护最佳的具有成本效益的解决方案,并且需要强制性包括或排除特定站点的替代解决方案。该成本既可以根据生物学价值的损失来确定,也可以根据额外的经济成本来定义,并且在基于利益函数的储备计划中具有明确的数学定义。与普遍使用的不可替代性概念的主要区别在于,后者描述了需要场地以实现特定保护目标的可能性。取而代之的是,重置成本告诉我们可以从储备网络中排除(或包括)某个站点的成本(生物或经济)。在这里,我们用假设的例子来说明这一概念,并表明替换成本分析在交互式计划过程中应被证明是有用的,从而提高了我们对场地对于节约成本保护的重要性的理解。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号