首页> 外文期刊>Resources, Conservation and Recycling >Estimation of the recycled content of an existing construction project
【24h】

Estimation of the recycled content of an existing construction project

机译:估算现有建设项目的可回收成分

获取原文
获取原文并翻译 | 示例
           

摘要

The Government's Sustainable Buildings Task Group recently recommended a benchmark requireinent for a minimum 10% of reused/reclaimed or recycled content (by material value) in construction projects. The benchmark would be implemented through Building Regulations and public sector procurement. This paper presents the findings of a pilot study to inform decision-making on the feasibility of setting and meeting such a requirement. The project involved determining current levels of recycled content in Defence Estates' standard design for modem barracks accommodation, and quantifying the scope to increase this content. The existing designs for the new barracks were found to use nearly 20% recycled and recovered materials. The project identified opportunities to increase this proportion to nearly 25% with no increase in cost or risk. (C) 2007 Elsevier B.V. All rights reserved.
机译:政府的可持续建筑任务组最近建议了一个基准要求,即建筑项目中至少10%的可重复使用的资源(按材料价值)。该基准将通过《建筑法规》和公共部门采购来实施。本文介绍了一项初步研究的结果,以为制定和满足此类要求的可行性提供决策依据。该项目涉及在国防庄园的现代军营住宿标准设计中确定当前可回收物质的含量,并量化增加该含量的范围。发现新营房的现有设计使用了将近20%的回收和回收材料。该项目确定了在不增加成本或风险的情况下将这一比例提高到近25%的机会。 (C)2007 Elsevier B.V.保留所有权利。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号