首页> 外文期刊>Resource management & recovery >Viridor’s first solar park begins operations
【24h】

Viridor’s first solar park begins operations

机译:Viridor的第一个太阳能公园开始运营

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

Viridor’s frst solar park, located on its closed landfll site in Westbury, Wiltshire, is now operational. The landfll took its last waste in 2004 and has since been fully restored to grassland. The solar park, which is on the northern part of the site, covers seven hectares and is designed to export 3,200MWh of electricity per annum to the National Grid. Featuring 12,780 panels, the park was built and installed for Viridor by Solar Century.
机译:Viridor的第一座太阳能公园位于威尔特郡韦斯特伯里(Westbury)封闭的Landfll场地上,现已投入使用。 Landfll于2004年进行了最后一次浪费,此后已全部恢复为草地。该太阳能公园位于场地的北部,占地7公顷,旨在向国家电网每年输出3200兆瓦时的电力。该公园拥有12,780个面板,由Solar Century为Viridor建造并安装。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号