首页> 外文期刊>Railway Technical Review >Testing of wheel/rail technologies on test rigs and in operational trials
【24h】

Testing of wheel/rail technologies on test rigs and in operational trials

机译:在试验台上和运营试验中测试轮/轨技术

获取原文
获取原文并翻译 | 示例
           

摘要

The Deutsche Bahn AG tests wheels, rails and points both before commissioning them and after they have entered service. It does so on large-scale test rigs at its Technology Centre and also by performing operational trials. The test rigs reproduce the rolling contact between wheels, rails and points almost on a 1:1 scale in terms of geometry, contact forces and speeds. This makes it possible to detect mechanisms likely to damage vehicles and track quickly and inexpensively. Furthermore, operational trials have confirmed the suitability of this approach to testing.
机译:Deutsche Bahn AG在调试之前和投入使用后都对车轮,钢轨和尖端进行测试。它在其技术中心的大型测试台上执行此操作,并且还执行操作试验。测试台在几何形状,接触力和速度方面几乎以1:1的比例复制了车轮,轨道和点之间的滚动接触。这使得可以检测可能损坏车辆的机构并快速且廉价地进行跟踪。此外,运营试验已经证实了这种测试方法的适用性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号