首页> 外文期刊>Light Railways >At Rooty Hill/EM Baldwin & Sons Pty Ltd, 1984-5
【24h】

At Rooty Hill/EM Baldwin & Sons Pty Ltd, 1984-5

机译:1984-5在Rooty Hill / EM Baldwin&Sons Pty Ltd处

获取原文
获取原文并翻译 | 示例
           

摘要

This is the first of a series of articles in which the late Craig Wilson took up the Baldwin story from where he left off in his book Built by Baldwin [Ed]. The 1980's saw a decrease in the number of orders for rail equipment, with canefield locomotive orders slowly drying up and colliery orders barely better. Balancing this, however, was the work flowing from constructing agricultural tractors that had been undertaken with a shortfall of rail work in mind. While the tractors were constructed at Castle Hill, their size brought home the inadequacy of even the fabrication shop, only built in 1978, for producing these vehicles on a production line basis. In 1984 the search commenced for suitable premises. By June, a property in Kellogg Road, Rooty Hill, had been purchased and was being expanded to accommodate the firm's Castle Hill operation. These additions resulted in a doubling of the workshop area together with extra office space. Castle Hill staff were informed of the move in June 1984. The first employees to move were a half dozen Assembly Department staff. They took possession of an area in the existing structure and commenced the assembly of a number of tractors while in the balance of the new shops the expansion and fit out continued. Equipment and staff moved progressively with most relocating in December and January around the normal Christmas closedown. The last area to relocate was the flameproof shop early in the new year. Apart from the gantry cranes, equipment was transferred wholly from Castle Hill.
机译:这是已故克雷格·威尔逊(Craig Wilson)从鲍德温(Ed)所著的《鲍德温故事》开始的系列文章中的第一篇。 1980年代,铁路设备的订单数量有所减少,canefield机车订单缓慢枯竭,而煤矿订单几乎没有好转。然而,要平衡这一点的是建造农用拖拉机所产生的工作,而这是在考虑到铁路工作不足的情况下进行的。尽管拖拉机是在城堡山建造的,但它们的尺寸甚至使仅在1978年建造的制造车间就不足以使它们在生产线上进行生产。 1984年开始寻找合适的房屋。到6月,已经购买了位于Rooty Hill的Kellogg Road的一处物业,并将对该物业进行扩展以适应该公司在Castle Hill的业务。这些增加导致车间面积加倍,并增加了办公空间。 1984年6月,Castle Hill的工作人员被告知了这一举动。最早搬迁的员工是六名装配部员工。他们占领了现有结构中的一块区域,并开始组装许多拖拉机,而在新商店的其余部分,扩张和装修仍在继续。设备和人员逐步转移,大部分人员在圣诞节期间正常关闭,并于12月和1月进行了搬迁。最后要搬迁的区域是新年初的防火商店。除龙门起重机外,设备全部从城堡山转移。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号