首页> 外文期刊>Natural Gas Week. >Kitimat Backers Confident Ample Gas Available to Make 2010 FID
【24h】

Kitimat Backers Confident Ample Gas Available to Make 2010 FID

机译:Kitimat支持者信心十足的天然气可用于2010 FID

获取原文
获取原文并翻译 | 示例
           

摘要

Kitimat LNG expects to have the necessary firm, long-term commitments from gas suppliers and buyers for its 700 million cubic feet per day LNG export plant and terminal in British Columbia sometime next year to make a final investment decision (FID) by the end of 2010, Kitimat President Rosemary Bolton told Natural Gas Week last week.Once the FID is in place, the project can proceed with completion of financing arrangements and engineering, procurement and construction contracts. The facility should be in operation by early to mid-2014.
机译:Kitimat LNG预计将在明年某个时候为其不列颠哥伦比亚省的每天7亿立方英尺LNG出口工厂和码头的天然气供应商和​​购买者做出必要的长期坚定承诺,以便在2008年底前做出最终投资决定(FID)。 Kitimat总裁罗斯玛丽·博尔顿(Rosemary Bolton)上周在《天然气周刊》(Natural Gas Week)上表示,一旦FID到位,该项目就可以完成融资安排以及工程,采购和建筑合同。该设施应在2014年初至中期投入运营。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号