...
首页> 外文期刊>Natural gas intelligence >Oklahoma-to-Alabama Midcontinent Express Line Goes Into Full Service
【24h】

Oklahoma-to-Alabama Midcontinent Express Line Goes Into Full Service

机译:俄克拉荷马州至阿拉巴马州中大陆特快专线全面服务

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Nearly one year to the date that the Federal Energy Regulatory Commission approved the project, the 500-mile Midcontinent Express Pipeline (MEP) went into full opera-tion last week (see NGI, Aug. 4, 2008). The second and final leg of the 500-mile pipeline went into service on Aug. 1, providing shale natural gas producers with a major route to eastern markets. This portion of the $1.3 billion line spans more than 200 miles from Delhi, LA, to Transcontinental Gas Pipe Line's (Transco) Station 85 in Butler, AL. Interim service on the first leg of the pipeline-from Bennington, OK, to Delhi-began in April (see NGI, April 27).
机译:距离联邦能源管理委员会批准该项目已经近一年了,上周500英里长的中大陆快速管道(MEP)全面投入运营(请参见NGI,2008年8月4日)。 500英里输油管道的第二站也是最后一站已于8月1日投入服务,为页岩气生产商提供了通往东部市场的主要途径。这条耗资13亿美元的管道的这一部分横跨200多英里,从洛杉矶到德里,再到洲际天然气管道的(Transco)85号车站在阿拉巴马州的巴特勒。从俄克拉荷马州本宁顿到德里的管道的第一站临时服务于4月开始(请参见NGI,4月27日)。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号