首页> 外文期刊>Model Engineer >JAMES BEGGS AND CO. BOTTLE FRAME ENGINE - completes the main frame before moving on to the bearing pedestal - Part III
【24h】

JAMES BEGGS AND CO. BOTTLE FRAME ENGINE - completes the main frame before moving on to the bearing pedestal - Part III

机译:詹姆斯·贝格斯公司瓶形框架发动机-在移至轴承座之前先完成主框架-第三部分

获取原文
获取原文并翻译 | 示例
           

摘要

Now the top recess can be machined and the neck of the casting bored to size. Now for the tricky bit, change to a self-centring chuck and use soft jaws that can be machined out to receive the top flange. Give tailstock support as shown in photo 7 and bring the bottom flange edge to finished diameter. Set up the fixed steady on the freshly machined flange edge and remove the tailstock support. Another photograph (photo 8) shows this arrangement. The extended base can now be machined away to give a finished flange thickness, at the bottom, of 5mm and the bottom should be bored out to 40 millimetres.
机译:现在可以加工顶部凹口,并且对铸件的颈部进行无聊的加工。现在,对于棘手的钻头,换成一个自动定心卡盘,并使用可以加工成可容纳顶部法兰的柔软钳口。如图7所示提供尾架支撑,并使底部法兰边缘达到最终直径。在刚加工的法兰边缘上安装固定支架,并卸下尾架支撑。另一张照片(照片8)显示了这种布置。现在,可以将加长的底座进行机械加工,以使底部的最终法兰厚度达到5mm,并且底部的钻孔深度应达到40毫米。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号