首页> 外文期刊>Mines & Carrieres >Analysis of the performances of a tunnel borer tin the Guadiaro-Majaceite (Spain) bypass gallery
【24h】

Analysis of the performances of a tunnel borer tin the Guadiaro-Majaceite (Spain) bypass gallery

机译:西班牙瓜迪亚罗-玛雅蜡岩旁路通道的隧道钻孔性能分析

获取原文
获取原文并翻译 | 示例
       

摘要

The UTE Gaudima group, made up of Dragados y Construcciones and the Fomento de Construcciones y Contratas (FCC), two major Spanish civil engineering firms, constructed this gallery in cooperation with the International Tunneling Services (ITS) group, made up of the Seli (Italy) and jaeger companies (Austria). ITS handled in particular the choice of borers and the from used For underground operations. This group also provided the necessary technical resources and manpower. The hydraulic gallery is 12, 185 meters long, and the finished inside dia-meter is 4.2 meters. The gallery crosses the Sierra de Libar mountain ranges in a southeastorthwest direction.
机译:由两个主要的西班牙土木工程公司Dragados y Construcciones和Fomento de Construcciones y Contratas(FCC)组成的UTE Gaudima集团与由Seli(意大利)和jaeger公司(奥地利)。 ITS特别处理了钻探的选择以及用于地下作业的钻探。该小组还提供了必要的技术资源和人力。液压通道长12,高185米,完成的内径为4.2米。画廊在东南/西北方向横穿塞拉利昂山脉(Sierra de Libar)山脉。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号