首页> 外文期刊>Gold & Minerals Gazette >Difficult logistics and workplace hazards reduced during installation of crushing gear
【24h】

Difficult logistics and workplace hazards reduced during installation of crushing gear

机译:在安装破碎机时减少了困难的后勤和工作场所危险

获取原文
获取原文并翻译 | 示例
           

摘要

An integral part of the evolving Karara iron ore operation in Western Australia's Mid West is its use of three MP1000 secondary cone crushers as supplied by Metso Minerals (Australia) Ltd. Furthermore, what made the installation of these pieces of equipment so interesting was the fact Metso delivered them fully assembled to the site - something that was made possible due to a lack of logistical restrictions. The Karara project - which is a joint venture between Gindalbie Metals Ltd and leading Chinese steel producer Ansteel - involves the integrated development of the world class namesake deposit in WA to produce both high grade magnetite concentrate on site and blast furnace quality pellets in north eastern China.
机译:西澳大利亚州中西部不断发展的卡拉拉铁矿石运营的一个组成部分是使用了三台由美卓矿产(澳大利亚)有限公司提供的MP1000二级圆锥破碎机。此外,使这些设备的安装如此有趣的原因是事实美卓将它们完全组装好后交付给现场,这是由于缺乏后勤限制而得以实现的。卡拉拉项目-由Gindalbie Metals Ltd与中国领先的钢铁生产商鞍钢合资成立-涉及西澳大利亚州世界级同名矿床的综合开发,以生产当地的高品位磁铁矿精矿和中国东北的高炉质量球团。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号