...
首页> 外文期刊>Gold & Minerals Gazette >Technology proving flexible
【24h】

Technology proving flexible

机译:技术证明灵活

获取原文
获取原文并翻译 | 示例
           

摘要

Austpac Resources NL is confident of securing the necessary funds to enable it to proceed a full feasibility study into the development of an enhanced roasting and magnetic separation synthetic rutile (ERMS SR) plant to produce 30,000 tonnes per annum of synthetic rutile. The company is currently building an ERMS SR demonstration plant to produce at least l,500t of synthetic rutile annually based on its technology, which is an ilmenite processing technique that produces very high grade synthetic rutile by combining Austpac's ERMS and enhanced acid regeneration system (EARS) technologies. ERMS is a roasting process which magnetises ilmenite, making it amenable to leaching in hydrochloric acid, while EARS regenerates hydrochloric acid from the waste iron chloride liquors produced by leaching ilmenite. For the past several years Austpac has been operating a pilot ERMS SR plant at Kooragang Island in New South Wales. With a 3 million dollars equity finance facility arranged with US investment fund Cornell Capital Partners LP for future working capital, Austpac managing director Mike Turbott said the group was now looking for the bulk of the funds to advance to the final feasibility study, which would then lead to the construction of the 30,000t per annum plant at an estimated cost of about
机译:Austpac Resources NL有信心获得必要的资金,以使其能够进行全面的可行性研究,以开发增强型的焙烧和磁分离合成金红石(ERMS SR)厂,该厂年产3万吨合成金红石。该公司目前正在建设一个ERMS SR示范工厂,基于其技术,该技术每年至少可生产1500吨合成金红石。钛铁矿加工技术是通过结合Austpac的ERMS和增强的酸再生系统(EARS)来生产极高品质的合成金红石。 )技术。 ERMS是一种将钛铁矿磁化的焙烧过程,使其可以浸入盐酸,而EARS则通过浸出钛铁矿产生的氯化铁废液再生盐酸。在过去的几年中,Austpac在新南威尔士州的库拉岗岛(Kooragang Island)开设了ERMS SR试验工厂。 Austpac董事总经理Mike Turbott表示,与美国投资基金Cornell Capital Partners LP共同安排了300万美元的股权融资设施,以用作未来的营运资金。导致建设年产3万吨的工厂,估计费用约为

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号