...
首页> 外文期刊>Butane-Propane News >Two Midwest Pipelines Shut Due to Flooding, Erosion
【24h】

Two Midwest Pipelines Shut Due to Flooding, Erosion

机译:两条中西部管道因洪水,侵蚀而关闭

获取原文
获取原文并翻译 | 示例
           

摘要

Enterprise Products confirmed Aug. 18 that two of its Midwest NGL pipelines have been closed due to severe flooding and erosion along the Missouri River. Enterprise's West Red pipeline was damaged due to severe flooding where it crosses the Missouri at Decatur, Neb., just upstream from the Whiting, Iowa terminal. In addition, the integrity of Enterprise's West Blue pipeline was compromised due to erosion in the flood plain on the east side of the river. At press time, the partnership had not predicted when it could commence repairs since flooding must recede before work can begin.
机译:企业产品公司8月18日证实,由于密苏里河沿岸的严重洪灾和侵蚀,其两条中西部天然气管道已经关闭。企业的西红管道由于严重洪水而受损,该管道横穿内华达州爱荷华州怀廷码头上游的内布拉斯加州迪凯特市的密苏里州。此外,由于河东侧的洪泛平原遭到侵蚀,企业西蓝管道的完整性受到损害。截至发稿时,该合作伙伴尚未预测何时可以开始维修,因为必须先减少洪水,然后才能开始工作。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号