...
首页> 外文期刊>Metallurgical Plant and Technology International >Second phase of slab caster revamping at Arcelor Dunkerque, France
【24h】

Second phase of slab caster revamping at Arcelor Dunkerque, France

机译:法国Arcelor Dunkerque的板坯连铸机第二阶段改造

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

CONTINUOUS CASTING In 2004, Arcelor decided to thoroughly modernize all its slab casters in operation at Dunkerque. The order for the overall project, which is implemented in three phases - one per year and each involving the complete rebuilding of a two-strand slab caster - was awarded to Danieli. Phase 1 of the project, presently in the advanced stage of equipment manufacturing, involved the complete rebuilding of slab caster CC23 to upgrade the original curved design into state-of-the-art, vertical curved technology. Phase 3, to be implemented during 2007, will see the same modification to caster CC21.
机译:连续铸造2004年,Arcelor决定彻底更新在Dunkerque运营的所有板坯连铸机。丹尼尔(Danieli)获得了整个项目的订单,该项目分三个阶段实施-每年一个,每个阶段都涉及两座板坯连铸机的全面改造。该项目的第一阶段(目前处于设备制造的高级阶段)涉及对板坯连铸机CC23的全面改造,以将原始弯曲设计升级为最新的垂直弯曲技术。第三阶段将于2007年实施,对脚轮CC21进行相同的修改。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号