...
首页> 外文期刊>Canadian Mining Journal >WINNING WAYS SAFETY EXTENDS LIFE OF BRUNSWICK MINE
【24h】

WINNING WAYS SAFETY EXTENDS LIFE OF BRUNSWICK MINE

机译:胜利之路延长了布鲁斯威克矿的生命

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

File this under "nice work if you can get it." A mine manager takes a two-year posting to close a mine in his home province and be close to family, and then his safety efforts helped lower costs to the point that the mine stays open an extra three years. That's exactly what happened to Xstrata Zinc's Greg Ashe when he accepted the general manager's job to close the 49-year-old Brunswick zinc-lead mine near Bathurst, NB. After almost a half century of mining, the Brunswick mine will shut down this spring. When the mine closes it will have extracted more than 136 million tonnes of ore from the No. 12 orebody, 13 million tonnes from its No.6 open pit, and processed another 200,000 tonnes of custom mill feed. Brunswick's concentrator processed approximately 150 million tonnes of ore and transitioned through five major changes in ownership: Brunswick Mining and Smelting Corporation, Noranda, Falconbridge, Xstrata and finally Glencore Xstrata.
机译:将其归档在“如果可以的话,做得很好”。一名矿山经理花了两年的时间关闭自己家乡的矿山,并与家人保持亲密关系,然后他的安全努力降低了成本,使矿山再开放三年。这就是Xstrata Zinc的格雷格·阿什(Greg Ashe)发生的事情,当时他接受了总经理的工作,关闭了位于北卡罗来纳州巴瑟斯特附近的49岁的Brunswick锌铅矿。经过近半个世纪的开采,不伦瑞克(Brunswick)矿山将于今年春天关闭。矿山关闭时,它将从12号矿体中提取超过1.36亿吨矿石,从6号露天矿中提取1300万吨,并再加工20万吨定制工厂饲料。不伦瑞克的选矿厂处理了约1.5亿吨矿石,并通过五个主要所有权变更进行了过渡:不伦瑞克矿业和冶炼公司,诺兰达,鹰桥,斯特拉塔,最后是嘉能可斯特拉塔。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号