...
首页> 外文期刊>Metal Architecture >Short construction schedule met with light-gauge steel
【24h】

Short construction schedule met with light-gauge steel

机译:轻型钢满足了较短的施工进度

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

A 90,000 sq. ft., three-story storage facility open for business ASAP-that's what Avon Self-Storage Partners wanted. It also wanted erection to take place in the middle of winter. To facilitate the tight construction schedule, Steel Elements Inc. of Gorham, NH, was selected as the single-source provider of the steel framing and components. The manufacturer generated electronic construction documents that included three-dimensional, isometric perspectives for faster dissemination of information to the entire building team, including designer Jack Wilburn, RA, of McLean, VA. Deliveries of materials started within two weeks of Steel Elements receiving the order. To save time on the jobsite for Boardwalk Development LLC, the Mansfield, MA, contractor and erector, Steel Elements assembled the door headers and piers, as well as several other framing components, in the shop prior to shipping.
机译:占地90,000平方英尺的三层存储设施可尽快为企业开放-这就是Avon自助存储合作伙伴想要的。它还希望在冬季中进行勃起。为了简化施工进度,新罕布什尔州戈勒姆的Steel Elements Inc.被选为钢框架和零件的单一来源提供商。制造商生成了电子施工文档,其中包括三维等距透视图,以便将信息更快地传播到整个建筑团队,包括弗吉尼亚州麦克莱恩市的设计师Jack Wilburn,RA。钢元素收到订单后的两周内开始交付材料。为了节省在马萨诸塞州曼斯菲尔德市的Boardwalk Development LLC,承包商和竖立工的工作时间,Steel Elements在发货前在商店里组装了门header和墩台以及其他几个框架部件。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号