首页> 外文期刊>Materials and Corrosion >Development of a new combined corrosion protection system for chloride-contaminated reinforced concrete structures
【24h】

Development of a new combined corrosion protection system for chloride-contaminated reinforced concrete structures

机译:研发一种用于氯化物污染的钢筋混凝土结构的新型组合式腐蚀防护系统

获取原文
获取原文并翻译 | 示例
           

摘要

Chloride-induced damage of reinforcing steel is especially for parking garages and bridges often very severe as large amounts of chlorides act on horizontal surfaces which could lead to fast ingress of these detrimental ions up to the level of the reinforcement and subsequently to high rates of corrosion. In order to avoid the disadvantages of conventional rehabilitation (unreliable prognosis with patch repair or high costs and regular maintenance with cathodic protection using impressed current) a new combined protection system was developed where the principle of drying out the concrete (by means of a surface protection system) is combined with a temporary cathodic protection (by means of a sprayed zinc layer) during the transitional period of the drying out process. This new system was tested both in the laboratory and on-site at a pilot application. Based on the results obtained the possibilities and limitations of the new system are discussed in this paper.
机译:氯化物引起的钢筋损坏特别是对于停车场和桥梁而言,通常非常严重,因为大量的氯化物作用在水平表面上,这可能导致这些有害离子快速进入钢筋水平,进而导致高腐蚀率。为了避免常规修复的缺点(补丁修复不可靠的预后或高昂的成本,以及使用外加电流进行阴极保护的常规维护),开发了一种新的组合保护系统,该系统将混凝土干燥(通过表面保护)系统)在干燥过程的过渡期间与临时阴极保护相结合(通过喷涂的锌层)。这个新系统在实验室和试验应用中都经过了测试。基于获得的结果,本文讨论了新系统的可能性和局限性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号