...
首页> 外文期刊>Foster Natural Gas Report >Tennessee Expresses Frustration With Commission Demand for Yet Another Technical Conference on Its Scheduling Priorities
【24h】

Tennessee Expresses Frustration With Commission Demand for Yet Another Technical Conference on Its Scheduling Priorities

机译:田纳西州对委员会要求再次安排其调度优先级的技术会议表示失望

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Tennessee Gas Pipeline Co. LLC (RP12-514) on February 19 asked FERC to grant rehearing of the January 17 order addressing its revised scheduling priorities, rescind its direction to Commission staff to convene another technical conference, withdraw the 2/8/13 data request, and accept Tennessee’s revised scheduling priority filed last year on 3/23/12. According to Tennessee, the policy considerations underlying its tariff changes have been before the Commission since 11/30/10 when it filed a general section 4 rate case (RP11-1566). As part of its case, Tennessee proposed a number of non-rate related tariff changes, including revisions to scheduling priorities. The rate case filing proposed to elevate firm transactions from secondary receipt points to primary delivery points to the same priority level as firm transactions from primary receipt points to primary delivery points. At a technical conference regarding the non-rate issues held February 15-16, 2011, Tennessee provided substantial information supporting its scheduling priorities proposal.
机译:田纳西州燃气管道有限公司(RP12-514)于2月19日要求FERC对其1月17日的订单进行重新演练,以解决其修订后的日程安排优先事项,撤消了其向委员会工作人员召开另一次技术会议的指示,撤回了2/8/13数据请求,并接受去年3月23日提交的田纳西州修订后的计划优先级。据田纳西州称,自关税委员会提交第4节一般费率案(RP11-1566)以来,其关税变动所依据的政策考虑已提交委员会。作为其案例的一部分,田纳西州提出了许多与费率无关的关税变更,包括对计划优先级的修订。利率案件备案建议将公司交易从次要收货点提升至主要交货点的优先级与公司交易从主要收货点至主要交货点的优先级相同。在2011年2月15日至16日举行的关于非利率问题的技术会议上,田纳西州提供了大量信息,以支持其计划优先事项提案。

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号