TENNESSEE AND CUSTOMERS REQUEST REHEARING/CLARIFICATION OF FERC'S TECHNICAL CONFERENCE ORDER ON VARIETY OF NON-RATE ISSUES; NORTHEASTERN UTILITIES AND STATES CHALLENGE DISCOUNT ADJUSTMENT OPTION POSED FOR TENNESSEE'S SYSTEM

机译:田纳西州和客户要求重审/澄清FERC关于各种非定息问题的技术会议令;田纳西州系统提出的东北地区公用事业和国家挑战折扣调整选项

获取原文
获取原文并翻译 | 示例
           

摘要

Tennessee Gas Pipeline Co. (RP11-1566) on June 30 requested rehearing of FERC's recent order on technical conference issued 5/31/11, specifically challenging the Commission's (1) rejection of its proposal to schedule firm secondary out-of-path service by price; (2) ruling that Tennessee place into effect reservation charge credits for force majeure service interruptions retroactive to 6/1/11, which is prior to an approval of Tennessee's proposal to switch to a straight fixed variable (SFV) rate design; and (3) rejection of a proposal to apply the daily imbalance charge on a regional basis, and indicating it could file the proposal in a new proceeding rather than allowing it to modify its tariff in a compliance filing.
机译:田纳西州天然气管道公司(RP11-1566)于6月30日要求对FERC最近在11年5月31日发布的技术会议上的命令进行复审,这特别挑战了委员会(1)拒绝其计划确定的二次过路服务的提议按价格(2)裁定田纳西州对追溯至6/1/11的不可抗力服务中断实施保留费用抵免额,这是在田纳西州提议改用固定固定变量(SFV)费率设计提案之前进行的; (3)拒绝在区域基础上应用每日不平衡费用的提议,并指出它可以在新程序中提出该提议,而不是允许其在合规性文件中修改其关税。

著录项

相似文献

  • 外文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号