首页> 外文期刊>Foster Natural Gas Report >GULF SOUTH PIPELINE CITES RISE IN RICH GAS DEMAND AS ONE REASON TO ABANDON AND TRANSFER SOUTH TEXAS DRY GAS PRODUCTION AND GATHERING FACILITIES TO BOARDWALK FIELD SERVICES
【24h】

GULF SOUTH PIPELINE CITES RISE IN RICH GAS DEMAND AS ONE REASON TO ABANDON AND TRANSFER SOUTH TEXAS DRY GAS PRODUCTION AND GATHERING FACILITIES TO BOARDWALK FIELD SERVICES

机译:南方天然气管道上升导致天然气需求上升,这是放弃和转移南德克萨斯州干天然气生产和向木板路现场服务汇聚的一个原因

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

Earlier this month, on May 10 Gulf South Pipeline Co. (CP11-478) submitted an application for FERC's authorization to abandon by sale or inter-corporate transfer to its affiliate, Boardwalk Field Services, LLC, approximately 280 miles of gathering and transmission pipelines, including appurtenant and auxiliary facilities, and two compressor stations, located in south Texas. The production area facilities (South Texas Facilities) that Gulf South proposes to abandon consist primarily of approximately 52 miles of 24-inch and 90 miles of 30-inch diameter pipeline (Index 129) plus the compressor stations. There is currently no straddle processing plant located on the facilities.
机译:本月初,5月10日,海湾南部管道公司(CP11-478)提交了FERC授权,以出售或公司间转让的方式向其附属公司Boardwalk Field Services,LLC放弃大约280英里的收集和输油管道包括附属和辅助设施,以及两个压缩机站,位于德克萨斯州南部。墨西哥湾南部提议放弃的生产区域设施(南德克萨斯设施)主要包括约52英里的24英寸和90英里的30英寸直径的管道(索引129)以及压缩机站。目前设施上没有跨式加工厂。

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号