首页> 外文期刊>Foster Natural Gas Report >Dominion NGL Pipelines Submits Ethane Pipeline Proposal to FERC -- to Establish Link Between Wet Gas Production in the Marcellus/Utica Plays and the ATEX Pipeline Extending to Mont Belvieu, Texas
【24h】

Dominion NGL Pipelines Submits Ethane Pipeline Proposal to FERC -- to Establish Link Between Wet Gas Production in the Marcellus/Utica Plays and the ATEX Pipeline Extending to Mont Belvieu, Texas

机译:Dominion NGL管道向FERC提交了乙烷管道提案-在Marcellus / Utica油田的湿气生产与延伸至德克萨斯州Mont Belvieu的ATEX管道之间建立联系

获取原文
获取原文并翻译 | 示例
           

摘要

On August 21, Dominion NGL Pipelines, LLC (OR13-32) petitioned FERC to issue a declaratory order approving: (1) the general rate structure for its new ethane pipeline -- the "Natrium Ethane Pipeline" -- extending from a new natural gas processing and fractionation plant operating in Marshall County, West Virginia, to an interconnection near Follansbee, W. Va. with Enterprise Products Partners, LP’s Appalachia to Texas Express (ATEX) pipeline; (2) the rate and terms agreed upon by Dominion NGL with a shipper that has made a long-term commitment to utilize, or pay for, significant capacity on the pipeline (the committed shipper); and (3) the rate design using revenue crediting to establish rates for "uncommitted shippers." The Natrium Ethane Pipeline is expected to cost approximately $136 million, including interest.
机译:8月21日,Dominion NGL Pipelines,LLC(OR13-32)请求FERC发出一项声明性命令,以批准:(1)其新乙烷管道(“ Nathan Ethane管道”)的一般费率结构从新的自然延伸。位于西弗吉尼亚州马歇尔县的天然气处理和分馏厂,与位于弗吉尼亚州福兰斯比附近的互连线与企业产品合作伙伴,LP的阿帕拉契亚州至德克萨斯快递(ATEX)管道相连; (2)Dominion NGL与已作出长期承诺以利用或支付大量管道能力的托运人(承诺的托运人)所商定的费率和条款; (3)使用收益入账确定“未承诺托运人”费率的费率设计。 Natrium Ethane管道(包括利息)预计耗资约1.36亿美元。

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号