首页> 外文期刊>Foster Natural Gas Report >FERC APPROVES BY DECLARATORY ORDER CONDITIONS FOR SUNOCO PIPELINE TO DEVELOP ITS MARINER WEST PIPELINE IN ORDER TO TAP MARCELLUS SHALE PRODUCTION BYPRODUCT
【24h】

FERC APPROVES BY DECLARATORY ORDER CONDITIONS FOR SUNOCO PIPELINE TO DEVELOP ITS MARINER WEST PIPELINE IN ORDER TO TAP MARCELLUS SHALE PRODUCTION BYPRODUCT

机译:FERC按声明性订单条件批准SUNOCO管道开发其海事西部管道以订购MARCELLUS页岩生产副产品

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

On 11/4/11 FERC granted a petition for a declaratory order sought in September by Sunoco Pipeline LP (OR11-22) approving: (1) priority service for the proposed Mariner West ethane pipeline; and (2) the overall tariff and rate structure for that project which will entail installing infrastructure to serve the Marcellus Shale production area. One segment of Sunoco's existing pipeline system consists of an 8-inch diameter pipeline extending approximately 130 miles from Toledo, Ohio, north to Marysville, Michigan, and the international border.
机译:11年1月1日,FERC批准了Sunoco Pipeline LP(OR11-22)于9月寻求的一项声明性命令,批准了:(1)拟议的Mariner West乙烷管道的优先服务; (2)该项目的整体电价和费率结构,这将需要安装基础设施以服务Marcellus页岩生产区。 Sunoco现有管道系统的一部分包括一条8英寸直径的管道,该管道从俄亥俄州的托莱多向北延伸至密歇根州的马里斯维尔和国际边界约130英里。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号