...
首页> 外文期刊>Foster Natural Gas Report >SFPP Has A Right To Lift West Line Rates, after Last Year’s Deferral; Commission Tweaks Opinion 527
【24h】

SFPP Has A Right To Lift West Line Rates, after Last Year’s Deferral; Commission Tweaks Opinion 527

机译:去年延期后,SFPP有权提高西线费率;委员会调整527号意见

获取原文
获取原文并翻译 | 示例

摘要

Last Friday, on 6/28/13, FERC accepted, subject to refund and a hearing, tariff records lodged on May 21 by SFPP, LP (IS13-416) to implement an index-based increase to rates and ceiling levels, effective July 1. The right to make oil pipeline rates equivalent to a FERC-adjusted rate ceiling has often been contentious, but FERC reaffirmed at the outset in this order that “a rate that is not increased to the ceiling level in a given year may nonetheless be increased to the ceiling level at a later time." Applying the Commission’s percentage comparison test, SFPP sought to demonstrate the divergence produced by the index percentage increase (7.934%) and the cost decrease (0.56%) is 8.3534 percentage points, a divergence that is less than 10% and within the bounds of what the Commission has accepted in the past.
机译:上周五(6/28/13),FERC接受了SFPP,LP(IS13-416)于5月21日提交的关税记录(有待退款和听证),以实施基于指数的费率和最高水平,自7月起生效1.使石油管道费率等于FERC调整后的费率上限的权利经常引起争议,但是FERC在一开始就重申了这一顺序,即“尽管如此,在给定年份未增加到费率上限的费率可能是SFPP应用委员会的百分比比较测试,力求证明指数增加百分比(7.934%)和成本降低(0.56%)产生的差异是8.3534个百分点,少于10%,并且在委员会过去接受的范围内。

著录项

相似文献

  • 外文文献
  • 中文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号