首页> 外文期刊>Foster Natural Gas Report >Parties File Exceptions to FERC Judge’s Initial Decision on Remand Regarding Seaway Crude Pipeline’s Rates and Terms of Service
【24h】

Parties File Exceptions to FERC Judge’s Initial Decision on Remand Regarding Seaway Crude Pipeline’s Rates and Terms of Service

机译:当事人对FERC法官关于海路原油管道费率和服务条款的还款初步决定提出异议

获取原文
获取原文并翻译 | 示例
       

摘要

Seaway Crude Pipeline Co. LLC5 (IS12-226) and other parties on or about 6/9/14 filed their exceptions to the Initial Decision on Remand issued on May 9 that dealt with rates and terms of service that may be applied on the approximately 500-mile, 30-inch diameter Seaway pipeline that provides north-to-south transportation of crude oil from Cushing, Oklahoma to the U.S. Gulf Coast at Jones Creek, Texas.6 The overriding issue, in Seaway’s opinion, is the need for the Commission “once again to uphold its established policy of honoring committed shipper rates entered into as part of a valid open season.” The Initial Decision violated that policy by recommending that the Commission replace the committed shipper rates with rates lower than those the pipeline and the committed shippers agreed to in their contracts. The Initial Decision adopted Trial Staff’s argument, instead, that Seaway’s committed rates must be lowered in order to prevent over-recovery on a cost-of-service basis. Also at stake, in Seaway’s opinion, is the Commission’s “fundamental institutional interest in ensuring that the Commission’s administrative law judges apply Commission policy.” Here, the Initial Decision directly contravened the Commission’s established committed rate policy as set forth in numerous decisions.
机译:Seaway Crude Pipeline Co. LLC5(IS12-226)和其他当事方于14/9/9左右提交了其5月9日发布的“初始还款决定”的例外,该决定涉及可能适用于大约500英里(30英寸)直径的Seaway管道提供从俄克拉荷马州的Cushing到得克萨斯州Jones Creek的美国墨西哥湾沿岸的原油从北向南的运输。6Seaway认为,首要的问题是对委员会“再次坚持其既定的政策,以兑现作为有效开放季节一部分而订立的托运人承诺的运费。”最初的决定违反了该政策,建议委员会以低于管道和承诺的托运人合同中约定的费率来代替承诺的托运人费率。最初的决定采纳了试验人员的观点,相反,必须降低Seaway的承诺费率,以防止在服务成本的基础上过度追偿。 Seaway认为,委员会“确保委员会的行政法法官适用委员会政策的根本机构利益”也受到威胁。在这里,初始决定直接违反了委员会在众多决定中所确立的承诺利率政策。

著录项

相似文献

  • 外文文献
  • 中文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号