FERC Clarifies Scope of Article 11.2 Limitations of 1996 El Paso Settlement, Denies All Petitions for Rehearing of Long-Simmering Contract and Rate Issues

机译:FERC澄清了1996年El Paso解决方案第11.2条的范围,否认了针对重审合同和费率问题的所有重审请求

获取原文
获取原文并翻译 | 示例
           

摘要

El Paso Natural Gas Co. (RP08-426) requested rehearing of FERC's suspension order on August 5, issued subject to refund and conditions, and establishing a hearing and technical conference to consider El Paso's new 6/30/08 rate increase filing. El Paso had tendered two sets of tariff sheets reflecting alternative methods for dealing with the issues addressed in its last rate case in March 2006 (RP05-422) that arose from Article 11.2 of the settlement approved in 1996 - El Paso (RP95-363). On 3/20/06, the Commission held that, despite the changes to the 1996 settlement mandated earlier, the "rate caps" and other limitations established in Article 11.2 continued to apply to El Paso's rates. The Commission also had resolved various other contested issues (see below).
机译:埃尔帕索天然气公司(RP08-426)要求在8月5日对FERC的停工令进行复审,但须退款并附带条件,并召开听证会和技术会议,以审议埃尔帕索新的6/30/08提价申请。埃尔帕索(El Paso)提交了两套价目表,反映了处理其在2006年3月的上一个税率案(RP05-422)中解决的问题的替代方法,这是1996年批准的和解协议第11.2条-埃尔帕索(RP95-363) 。在2006年3月20日,委员会裁定,尽管早先授权的1996年和解协议发生了变化,但第11.2条规定的“费率上限”和其他限制仍然适用于埃尔帕索的费率。委员会还解决了其他有争议的问题(见下文)。

著录项

相似文献

  • 外文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号