...
首页> 外文期刊>Foster Natural Gas Report >Perryville Gas Storage Piles Application with PERC to Develop Two 7.5 Bcf Working Capacity Gas Storage Caverns in Louisiana near Pipelines Operated by centerpoint and columbia gulf
【24h】

Perryville Gas Storage Piles Application with PERC to Develop Two 7.5 Bcf Working Capacity Gas Storage Caverns in Louisiana near Pipelines Operated by centerpoint and columbia gulf

机译:佩里维尔储气管桩与PERC一起在路易斯安那州附近由中心点和哥伦比亚湾运营的管道附近开发两个工作能力达7.5 Bcf的储气室

获取原文
获取原文并翻译 | 示例

摘要

An application filed on 5/26/09 by Perryville Gas Storage LLC (CP09-418) requested FERC certificates authorizing a new natural gas storage facility in the Crowville Salt Dome underground salt formation, and related facilities in Franklin and Richland Parishes, Louisiana. The project will provide approximately 15 Bcf working gas capacity in two caverns, and will involve construction of related facilities including natural gas pipeline interconnections to two existing interstate pipelines. The proposed interconnections are with CenterPoint Energy Gas Transmission (CEGT) and with Columbia Gulf Transmission near Delhi, La. Each of the two caverns are proposed to have approximately 7.5 Bcf of working gas capacity. Upon completion, Perryville will be capable of receiving and injecting gas at maximum rates of up to 226 MMcf/d and delivering and withdrawing gas at maximum rates of up to 600 MMcf/d, with a capability of 8 cycles per year.
机译:Perryville Gas Storage LLC(CP09-418)于2009年5月26日提交的申请书要求FERC证书授权在Crowville Salt Dome地下盐层中的新天然气储存设施,以及路易斯安那州富兰克林和Richland Parishes的相关设施。该项目将在两个洞穴中提供约15 Bcf的工作气体产能,并将涉及相关设施的建设,包括天然气管道与两条现有州际管道的互连。拟议中的互连是与CenterPoint能源气体传输(CEGT)以及与位于路易斯安那州德里附近的哥伦比亚海湾传输的互连。两个洞穴均被建议具有约7.5 Bcf的工作气体容量。完工后,佩里维尔将能够以高达226 MMcf / d的最大速率接收和注入气体,并以高达600 MMcf / d的最大速率输送和抽取气体,每年能够进行8个循环。

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号