...
首页> 外文期刊>Foster Natural Gas Report >FERC OKs Transco's Delta Lateral Project in Pennsylvania
【24h】

FERC OKs Transco's Delta Lateral Project in Pennsylvania

机译:FERC确认了转录的宾夕法尼亚三角洲项目

获取原文
获取原文并翻译 | 示例
           

摘要

On 10/28/09 FERC granted Transcontinental Gas Pipe Line Co. LLC (CP09-237) authorization to construct a 3.42-mile, 16-inch diameter pipeline and appurtenant facilities in York County, Pennsylvania (Delta Lateral) subject to certain conditions. The Delta Lateral will extend from Transco's mainline at Station 195 to a natural gas and oil-fired electric power generation plant currently under construction in Peach Bottom Township, Pennsylvania (Delta Power Plant). The Delta plant will be owned and operated by Conectiv Mid Merit, LLC (CMM). The maximum capacity of the Delta Lateral is 208,800 dth/d. Transco estimates the total construction cost for the Delta Lateral and related facilities to be $12,527,931.
机译:在一定条件下,09年10月28日,FERC授予Transcontinental Gas Pipe Line Co. LLC(CP09-237)授权,在宾夕法尼亚州约克县(三角洲横向)建造3.42英里,直径16英寸的管道和附属设施。三角洲横向发电站将从Transco的195号站主干延伸到宾夕法尼亚州Peach Bottom Township正在建设的天然气和燃油发电厂(三角洲发电厂)。 Delta工厂将由Conectiv Mid Merit,LLC(CMM)拥有和运营。三角洲横向最大容量为208,800 dth / d。 Transco估计三角洲侧向及相关设施的总建筑成本为12,527,931美元。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号