...
首页> 外文期刊>Foster Natural Gas Report >Columbia Renews Challenge to Order That Would Require Consideration of Quantities Deemed to Be Scheduled under Rate Schedule SIT in Determining Scheduling Penalties
【24h】

Columbia Renews Challenge to Order That Would Require Consideration of Quantities Deemed to Be Scheduled under Rate Schedule SIT in Determining Scheduling Penalties

机译:哥伦比亚再次提出要求在确定调度罚款时需要考虑根据费率表SIT进行调度的数量的订单挑战

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Columbia Gas Transmission Corp. (RP08-295) on 6/22/09 asked the Commission to reverse its recent order conditionally accepting changes to its Storage in Transit (SIT) Rate Schedule. SIT was designed as an interruptible balancing service for shippers with wide swings in daily demand, e.g., electric power plants. Shippers use SIT service in conjunction with transportation service agreements that are deemed subject to Rate Schedule SIT. When daily receipts under a transportation service agreement exceed daily deliveries, Columbia injects the difference into storage on an interruptible basis. When daily deliveries exceed daily receipts, Columbia withdraws the difference out of storage.
机译:哥伦比亚天然气运输公司(RP08-295)于2009年6月22日要求委员会撤销其最近的命令,有条件地接受对其运输途中存储(SIT)费率表的更改。 SIT被设计为可中断的平衡服务,适用于日需求大幅度波动的托运人,例如发电厂。托运人将SIT服务与被视为受Rate Schedule SIT约束的运输服务协议结合使用。当运输服务协议下的每日收据超过每日交付量时,哥伦比亚会以可中断的方式将差额注入仓库。当每日交付量超过每日收据时,哥伦比亚会从仓库中提取差额。

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号