...
首页> 外文期刊>Foster Natural Gas Report >Bison Pipeline Files Formal Application with FERC, Backed by Four Shippers, Seeking Authorization to Build 300 Mile Pipeline Linking Powder River Basin, North Dakota and the Midwest
【24h】

Bison Pipeline Files Formal Application with FERC, Backed by Four Shippers, Seeking Authorization to Build 300 Mile Pipeline Linking Powder River Basin, North Dakota and the Midwest

机译:Bison管道文件在FERC的正式申请下,得到四个托运人的支持,并寻求授权建造连接粉河,北达科他州和中西部的300英里管道

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Bison Pipeline LLC (CP09-161) has filed with FERC for a certificate authorizing the construction, ownership and operation of approximately 302 miles of 30-inch diameter pipeline, one compressor station, two meter stations and other appurtenant facilities.
机译:Bison Pipeline LLC(CP09-161)已向FERC提交了一份证书,以授权其大约302英里长的30英寸直径管道,一个压缩机站,两个仪表站以及其他附属设施的建设,拥有和运营。

著录项

相似文献

  • 外文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号