首页>
外文期刊>Foster Natural Gas Report
>Bison Pipeline Files Formal Application with FERC, Backed by Four Shippers, Seeking Authorization to Build 300 Mile Pipeline Linking Powder River Basin, North Dakota and the Midwest
【24h】
Bison Pipeline Files Formal Application with FERC, Backed by Four Shippers, Seeking Authorization to Build 300 Mile Pipeline Linking Powder River Basin, North Dakota and the Midwest
Bison Pipeline LLC (CP09-161) has filed with FERC for a certificate authorizing the construction, ownership and operation of approximately 302 miles of 30-inch diameter pipeline, one compressor station, two meter stations and other appurtenant facilities.
展开▼