首页> 外文期刊>Foster Natural Gas Report >Colorado Hub Connection Would Tie Greasewood and Meeker Hubs to Northwest's Mainline, Take Away More Rockies Gas
【24h】

Colorado Hub Connection Would Tie Greasewood and Meeker Hubs to Northwest's Mainline, Take Away More Rockies Gas

机译:科罗拉多枢纽连接将把Greasewood和Meeker枢纽连接到西北的干线,带走更多的落基山脉天然气

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

Northwest Pipeline GP (CP08-477) on 9/23/08 proposed to construct and operate 27.4 miles of 24-inch diameter pipeline from its mainline at the Sand Springs meter station near Rangely, Colo., to an interconnection with Enterprise Production Operating LLC's Meeker gas processing plant and the White River Hub, both in Rio Blanco County, Colo. The project would move 582,000 dth/d from the White River Hub into Northwest's existing mainline. The estimated cost is 60.4 million, and the target in-service date is 11/1/09, although certain shippers elected for mainline service one year earlier - by 11/1/08.
机译:西北管线GP(CP08-477)于9/23/08建议,从科罗拉多州兰吉利附近的桑德斯普林斯计量站的主干线到与Enterprise Production Operating LLC's的互连线,建设和运营27.4英里长的24英寸直径管道位于科罗拉多州里奥布兰科县的米克尔天然气加工厂和怀特河枢纽,该项目将从怀特河枢纽转移582,000 d / d d / d到西北地区现有干线。估计费用为6040万,目标服务日期为09年1月1日,尽管某些托运人提前一年选出了主线服务-到2008年11月1日。

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号