首页> 外文期刊>NGW's Gas Market Reconnaissance >Tallgrass Energy Partners has started an an open season to transport gas on the proposed 70-mile Cheyenne Connector pipeline from the Denver-Julesburg Basin to the Rockies Express Pipeline's Cheyenne Hub just south of the Colorado-Wyoming border.
【24h】

Tallgrass Energy Partners has started an an open season to transport gas on the proposed 70-mile Cheyenne Connector pipeline from the Denver-Julesburg Basin to the Rockies Express Pipeline's Cheyenne Hub just south of the Colorado-Wyoming border.

机译:Tallgrass Energy Partners开始了一个开放的季节,以将丹佛Julesburg盆地到Colorado-Wyoming边境南部的丹佛Julesburg盆地上拟议的70英里Cheyenne连接器管道运输汽油。

获取原文
获取原文并翻译 | 示例
           

摘要

An end date for the open season was not provided. Cheyenne Connector has signed long-term precedent agreements to transport 600 MMcf/d of gas with affiliates of Anadarko Petroleum and DCP Midstream. Cheyenne Connector would provide takeaway solutions for DJ Basin producers, connecting gas to REX’s Cheyenne Hub where it can then be delivered to numerous demand markets across the country on either REX or other interconnected pipelines.
机译:未提供开放季的结束日期。 Cheyenne连接器签署了长期先例协议,将600 mmcf / d与Anadarko石油和DCP中游的附属公司运输。 Cheyenne连接器将为DJ盆地生产商提供外卖解决方案,将气体连接到REX的Cheyenne Hub,然后可以在全国范围内送到雷克斯或其他互连管道上的许多需求市场。

著录项

相似文献

  • 外文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号