...
首页> 外文期刊>Canadian C2+ Petrochemical Report >Canaport about to start operations; MapleLNG and Keltic less certain
【24h】

Canaport about to start operations; MapleLNG and Keltic less certain

机译:Canaport即将开始运营; MapleLNG和Keltic不太确定

获取原文
获取原文并翻译 | 示例
           

摘要

Canada's first LNG terminal, CanaportLNG, just east of St John, NB is over 95% complete and will receive its first shipment from Trinidad at the end of May. One tank is complete, the second is being finished and the third will be ready at the end of the year or early next year. The Brunswick Pipeline connecting Canaport to the Maritimes & Northeast Pipeline at the US border is also mechanically complete and just requires some “cleanup” work in the spring before it will be ready to transport the gas to the US. Canaport is owned 75% by Repsol of Spain and 25% by Irving.
机译:加拿大第一个LNG接收站CanaportLNG位于新罕布什尔州圣约翰市以东,完工率已超过95%,并将于5月底从特立尼达接收首批货物。一辆战车已经完成,第二辆战车已经完成,第三辆战车将在年底或明年年初准备就绪。在加拿大边境连接Canaport到海事和东北管道的不伦瑞克管道也已经完成,仅在春季需要进行一些“清理”工作,然后才能将天然气运输到美国。 Canaport由西班牙的Repsol拥有75%的股份,由Irving拥有25%的股份。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号