Biomass projects - an installation checklist

机译:生物质项目-安装清单

获取原文
获取原文并翻译 | 示例

摘要

There are areas in which problems commonly arise with any renewable energy project. Rushing to beat degression deadlines only increases the likelihood of this.Renewable Energy Association figures show more than 50% of biomass projects have at least one problem during installation. The main issues and their resolutions include: Digging pipe routes without first carrying out surveys to identify existing services, trenches filling with water when exposed, failure to agree pipe routes prior to contract signature. All of these cause problems. Carry out a detailed discussion with the installer before signing a contract. Make sure pipes are installed correctly in accordance with manufacturers' recommendation - they need to be compliant for your warranty.
机译:在某些领域中,任何可再生能源项目通常都会出现问题。赶不及赶完交付截止日期只会增加这种可能性。可再生能源协会的数据显示,超过50%的生物质项目在安装过程中至少存在一个问题。主要问题及其解决方案包括:在不首先进行调查以识别现有服务的情况下挖掘管道,在裸露的沟渠中注满水,在签订合同之前未同意管道。所有这些都会引起问题。签订合同之前与安装人员进行详细讨论。确保按照制造商的建议正确安装了管道-它们必须符合您的保修要求。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号