...
首页> 外文期刊>European Journal of Operational Research >Branch and bound based heuristic for multi-product resource constrained scheduling problem in FMS environment
【24h】

Branch and bound based heuristic for multi-product resource constrained scheduling problem in FMS environment

机译:FMS环境下基于分支和边界的启发式多产品资源受限调度问题

获取原文
获取原文并翻译 | 示例

摘要

This paper addresses an inter-dependent multiple-product resource-constrained scheduling problem with the objective of makespan minimization in a flexible manufacturing system with resource flexibility. Both consumable and non-consumable resources are considered along with their alternative types and constrained utilization rates. A 0-1 integer linear programming formulation is presented for the problem. The complexity of the problem is observed to be at increase with the availability of alternate resources for product operations. A branch and bound based heuristic is proposed as a solution methodology. A numerical example is presented to illustrate the problem and the effectiveness of the heuristic.
机译:本文解决了一个相互依赖的多产品资源受限的调度问题,其目标是在具有资源灵活性的柔性制造系统中最小化制造期。消耗性和非消耗性资源以及它们的替代类型和受限的利用率都被考虑在内。针对该问题提出了0-1整数线性规划公式。观察到问题的复杂性随着产品操作的备用资源的可用性而增加。提出了一种基于分支和边界的启发式方法作为解决方法。数值例子说明了启发式方法的问题和有效性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号