首页> 外文期刊>European Journal of Operational Research >A two-phase ant colony algorithm for multi-echelon defective supply chain network design
【24h】

A two-phase ant colony algorithm for multi-echelon defective supply chain network design

机译:多阶段缺陷供应链网络设计的两阶段蚁群算法

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

Supply chain system is an integrated production system of a product. In the past researches, this system was often assumed to be an equilibrium structure, but in real production process, some members in this system usually cannot effectively complete their production task because of the losses of production, which will reduce the performance of the whole supply chain production system. This supply chain with the losses of production is called the defective supply chain (DSC) system. This research will discuss the partner selection and the production-distribution planning in this DSC network system. Besides the cost of production and transportation, the reliability of the structure and the unbalance of this system caused by the losses of production are considered. Then a germane mathematical programming model is developed for solving this problem. Due to the complex problem and in order to get a satisfactory near-optimal solution with great speed, this research proposes seeking the solution with the solving model based on ant colony algorithm. The application results in real cases show that the solving model presented by this research can quickly and effectively plan the most suitable type of the DSC network and decision-making of the production-distribution. Finally, a comparative numerical experiment is performed by using the proposed approach and the common single-phase ant colony algorithm (SAC) to demonstrate the performance of the proposed approach. The analysis results show that the proposed approach can outperform the SAC in partner selection and production-distribution planning for DSC network design. (C) 2007 Elsevier B.V. All rights reserved.
机译:供应链系统是产品的集成生产系统。在过去的研究中,该系统通常被假定为平衡结构,但是在实际生产过程中,该系统中的某些成员通常由于生产损失而无法有效地完成生产任务,这会降低整个供应的绩效。连锁生产系统。这种具有生产损失的供应链称为有缺陷的供应链(DSC)系统。这项研究将讨论该DSC网络系统中的合作伙伴选择和生产分配计划。除了生产和运输成本外,还要考虑结构的可靠性以及由于生产损失而导致的系统不平衡。然后开发了一个德国数学编程模型来解决这个问题。由于问题复杂,为了快速获得满意的近似最优解,本研究提出了一种基于蚁群算法的求解模型。实际应用结果表明,该研究提出的求解模型可以快速有效地规划最适合的DSC网络类型和生产分布的决策。最后,使用所提出的方法和常见的单相蚁群算法(SAC)进行了比较数值实验,以证明所提出的方法的性能。分析结果表明,在DSC网络设计的合作伙伴选择和生产分配计划中,该方法可以胜过SAC。 (C)2007 Elsevier B.V.保留所有权利。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号