...
首页> 外文期刊>European Journal of Operational Research >A hybrid scatter search for the discrete time/resource trade-off problem in project scheduling
【24h】

A hybrid scatter search for the discrete time/resource trade-off problem in project scheduling

机译:项目调度中离散时间/资源权衡问题的混合分散搜索

获取原文
获取原文并翻译 | 示例
           

摘要

We develop a heuristic procedure for solving the discrete time/resource trade-off problem in the field of project scheduling. In this problem, a project contains activities interrelated by finish-start-type precedence constraints with a time lag of zero, which require one or more constrained renewable resources. Each activity has a specified work content and can be performed in different modes, i.e. with different durations and resource requirements, as long as the required work content is met. The objective is to schedule each activity in one of its modes in order to minimize the project makespan. We use a scatter search algorithm to tackle this problem, using path relinking methodology as a solution combination method. Computational results on randomly generated problem sets are compared with the best available results indicating the efficiency of the proposed algorithm. (C) 2007 Elsevier B.V. All rights reserved.
机译:我们开发了一种启发式程序来解决项目调度领域中离散的时间/资源权衡问题。在这个问题中,一个项目包含与完成-开始类型优先级约束相关的活动,且时滞为零,这需要一个或多个受约束的可再生资源。每个活动都有指定的工作内容,并且只要满足所需的工作内容,就可以以不同的模式(即具有不同的持续时间和资源要求)执行。目的是按照其模式之一计划每个活动,以最大程度地缩短项目工期。我们使用散点搜索算法来解决此问题,使用路径重新链接方法作为解决方案组合方法。将随机生成的问题集上的计算结果与表明该算法有效的最佳可用结果进行比较。 (C)2007 Elsevier B.V.保留所有权利。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号