Time/cost trade-offs in project scheduling with time-switch and resource constraints

机译:具有时间切换和资源限制的项目进度中的时间/成本权衡

获取原文

摘要

Time/cost trade-offs problems in the project management is the important role. The project scheduling with the traditional approach does not consider the difference execution time on the unit period for all activities of project. In this paper, firstly, it presents an introduction of the problem description of time-switch constraints. Then, the project scheduling with time-switch constraints under the resource constraints is proposed. Time/cost trade-offs problems, it takes the Max-NPV as the objective function. Moreover, we build the mathematic model about the TCTPTSC from the view of the contractor. Finally, it validates by adopting a numerical example. The results show that time-switch constraints can change the arrangements for project scheduling more closely to realistic situation, with the view real returns by the NPV(Net present value), so the contractor can carry out accurate decision-making and project control.
机译:时间/成本的权衡问题在项目管理中是重要的角色。采用传统方法的项目计划不考虑项目所有活动的单位周期执行时间差异。本文首先介绍了时间切换约束的问题描述。然后,提出了在资源约束下具有时间切换约束的项目调度。时间/成本的权衡问题,它以Max-NPV为目标函数。此外,我们从承包商的角度建立了关于TCTPTSC的数学模型。最后,通过一个数值示例进行验证。结果表明,时间转换约束可以更接近实际情况改变项目进度安排,并以净现值(NPV)的角度查看实际回报,因此承包商可以进行准确的决策和项目控制。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号