Time-cost trade-off resource-constrained project scheduling problem with stochastic duration and time crashing

机译:时间成本折衷的资源受限的项目调度问题,具有持续时间和时间随机性

获取原文
获取原文并翻译 | 示例
           

摘要

In this paper, time crashing is implemented to solve the limitation of buffer insertion when consider the high variability of activities and resources in resource constrained project scheduling problem (RCPSP). The activity duration and resource are considered to be beta and exponential distributed, respectively. To settle the discrete time-cost trade off problem, a nonlinear combinatorial optimisation model is developed to pursuing the time, cost and robustness of the project. Six improvement principles are proposed and three balance points are discovered according to the different situations in the time-cost trade-off process, in which the earliness bonus, tardiness penalty, instability cost and time crashing cost are involved. To minimise total budget of the project, tabu search and starting time criticality heuristic is designed as the solution method. Finally, a numerical example is presented to highlight the efficiency of proposed model and solution method.
机译:本文考虑了资源受限的项目调度问题(RCPSP)中活动和资源的高度可变性,实现了时间崩溃来解决缓冲区插入的限制。活动持续时间和资源分别被认为是beta和指数分布的。为了解决离散的时间成本权衡问题,开发了非线性组合优化模型以追求项目的时间,成本和鲁棒性。提出了六项改进原则,并根据时间成本权衡过程中的不同情况,找到了三个平衡点,其中涉及了提前奖金,拖延罚分,不稳定成本和工时成本。为了最大程度地减少项目的总预算,设计了禁忌搜索和开始时间临界度启发式方法作为解决方法。最后,通过数值例子说明了所提模型和求解方法的有效性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号