...
首页> 外文期刊>European Journal of Operational Research >A planning and scheduling model for onsertion in printed circuit board assembly
【24h】

A planning and scheduling model for onsertion in printed circuit board assembly

机译:印刷电路板装配中插入的计划和调度模型

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

A planning and scheduling model is developed for the onsertion-phase in printed circuit board (PCB) assembly. PCBs are manufactured by machines that mount components, such as chips, on a PCB. On an onsertor machine, a certain number of component types can be stored. These components are subsequently used for the production of a certain PCB batch type. This research develops a production planning and scheduling formulation to determine the component-machine allocations, as well as a PCB sequence. Two strategies are proposed; one focusing on minimal number of changeovers (C-strategy), and the other on minimal process time (P-strategy). Both strategies were validated in a pilot study with real company data, with encouraging results for potential implementation. (c) 2006 Elsevier B.V. All rights reserved.
机译:针对印刷电路板(PCB)组件的插入阶段开发了计划和调度模型。 PCB是通过将零件(例如芯片)安装在PCB上的机器制造的。在onsertor机器上,可以存储一定数量的组件类型。这些组件随后用于生产某些PCB批次类型。这项研究制定了生产计划和计划表,以确定组件机器的分配以及PCB的顺序。提出了两种策略;一个侧重于最少的转换(C策略),另一个侧重于最小的处理时间(P策略)。两种策略均已通过对真实公司数据的试点研究进行了验证,并为潜在的实施提供了令人鼓舞的结果。 (c)2006 Elsevier B.V.保留所有权利。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号