The Sevan Voyageur FPSO is en-route to the Shelly field in the Central UK North Sea after leaving the Keppel Verolme Shipyard in Rotterdam. Some 12 months of hook-up and commissioning work on the topside and marine systems has been carried out and the FPSO is leaving the shipyard 19 months after the contract signature with Oilexco.
展开▼