...
首页> 外文期刊>European Offshore Petroleum Newsletter >...as Aker'can still build'Goliat FPSO
【24h】

...as Aker'can still build'Goliat FPSO

机译:...因为Aker'仍可以建造'Goliat FPSO

获取原文
获取原文并翻译 | 示例

摘要

Aker Solutions says it can still win construction work on the Goliat project despite losing out in a design competition for the job to Sevan Marine.Aker said in a statement:"We respect that Eni has chosen a different concept than the one we presented in our offer.We are satisfied that Eni has commented that they have not awarded the contract for the engineering,procurement and construction(EPC)of the project,which the tender originally implied.
机译:Aker Solutions表示,尽管在设计竞赛中输给Sevan Marine,但仍能赢得Goliat项目的建设工作。Aker在一份声明中说:“我们尊重Eni选择了与我们提出的概念不同的概念。报价。我们对Eni评论说,他们没有授予该项目的工程,采购和建设(EPC)合同表示满意,该合同最初暗示。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号