首页> 外文期刊>Erdol Erdgas Kohle >Technische Herausforderungen bei der untertagigeti Erweiterung des Erdgas-Kavernenspeichers Empelde
【24h】

Technische Herausforderungen bei der untertagigeti Erweiterung des Erdgas-Kavernenspeichers Empelde

机译:Empelde天然气洞穴存储设施地下扩建的技术挑战

获取原文
获取原文并翻译 | 示例

摘要

The gas cavern storage facility in Empelde came into Operation with three caverns between the early and the middle nineteen-eighties and is subject to a surface and subsurface extension since 2004. The subsurface extension comprises the con-struction oftwo new caverns (K4 is operated since 2009, K5 in leaching process since 2010) and the leaching extension as -well as repair works of both existing caverns K2 (since 2012 in gas Operation again) and K1 (is being re-leached since the end of 2012). The Volumetrie extension process of cavern K2 took place in three steps: flooding, re-leaching, gas re-filling. The flooding with water through a 4 1/2" tubing were imple-mented discontinuously alternating with phases of gas withdrawal through the annu-lus 41/2 "x 9 5/8 " in order to minimize the risk of hydrateformation. The length of the indi-vidual phases mainly depended on the gas demand/consumption of the storage users. Water injeetion has been made in a gas well-head pressure range above the hydrostatic pressure ofthe water column in order to keep it stable at any time and to keep the cavern pressure high. The cavern volume increased by 12% because ofthe flooding.
机译:Empelde的天然气洞穴存储设施于19世纪80年代中期至中期开始运营,共有三个洞穴,并且自2004年以来受到地面和地下扩展。地下扩展包括两个新洞穴的建设(K4自2009年,K5的浸出过程自2010年开始),现有的溶洞K2(自2012年开始在天然气运营中)和K1(自2012年底开始重新浸出)的浸出扩展以及维修工作。洞穴K2的Volumetrie扩展过程分三个步骤进行:注水,再浸出,注气。为了使水合形成的风险降到最低,通过4 1/2“管道注水的过程与通过环形41/2” x 9 5/8“抽气的阶段不连续进行。各个阶段主要取决于存储用户的天然气需求/消耗,在高于水柱静水压力的气井口压力范围内注水是为了随时保持稳定并保持洞穴压力高,由于洪水,洞穴体积增加了12%。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文