首页> 外文期刊>Equipment today >EXTREME SHORING: Pipelaying project requires a customized shoring solution
【24h】

EXTREME SHORING: Pipelaying project requires a customized shoring solution

机译:极端支撑:管道铺设项目需要定制的支撑解决方案

获取原文
获取原文并翻译 | 示例
           

摘要

S. J. Lewis Construction, Inc., Waite Park, MN, employs over 400 people and specializes in underground utility work, particularly large-diameter pipe installations. The company was recently awarded a USD22 million contract from the City of Albuquerque, NM, to install a new raw water transmission line that will divert water from the Rio Grande to a new state-of-the-art water treatment plant. The plant is scheduled for completion in 2008.
机译:明尼苏达州怀特公园的S. J. Lewis Construction,Inc.拥有400多名员工,专门从事地下公用事业,特别是大口径管道安装。该公司最近获得了新墨西哥州阿尔伯克基市的2200万美元合同,安装一条新的原水输送线,该输送线将把水从里奥格兰德河转移到一个新的最先进的水处理厂。该工厂计划于2008年完工。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号