SUPERVISED SHUTDOWN ALGORITHM FOR AN OFF-SHORE WIND POWER PLANT TO MEET THE REQUIRED RAMP RATE OF A GRID CODE IN A STORM-DRIVEN SITUATION

机译:用于离岸风电厂的监督关闭算法,以满足风暴驱动情况下网格码所需的斜坡速率

获取原文

摘要

This paper proposes a supervised shutdown algorithm for an off-shore wind power plant (WPP) to meet a required ramp-down rate of a grid code in a storm-driven situation. The algorithm determines the number of wind generators (WGs) to shutdown simultaneously by considering the required ramp-down rate of a WG without using a brake. Based on the wind direction and speed measured at a wind mast (WM), wind arrival times from a WM to each WG are calculated. Then, a sequence of WGs is generated in the order of wind arrival time and subsequently a group sequence is generated. The shutdown end time of each group is determined as the minimum wind arrival time in the group whilst the shutdown start time is determined by subtracting the duration of the shutdown from the end time. If the shutdown start/end times of adjacent groups are overlapped, the start/end times of the preceding group are re-scheduled by considering the overlapped time. The performance of the algorithm is verified under various storm conditions. The results indicate that the algorithm can shut down the WPP without exceeding the required ramp rate in a grid code.
机译:本文提出了一种用于离岸风电厂(WPP)的监督关闭算法,以满足暴风行情况下的网格码所需的斜坡速率。该算法通过考虑WG的所需的倾斜速率而不使用制动器,确定风力发生器(WGS)的数量同时关闭。基于风桅杆(WM)测量的风向和速度,计算从WM到每个WG的风到达时间。然后,以风到达时间的顺序生成一系列WGS,随后生成组序列。每个组的关断结束时间被确定为组中的最小风到达时间,而关断开始时间通过从结束时间中减去关闭的持续时间来确定。如果相邻组的关断开始/结束时间重叠,则通过考虑重叠的时间来重新安排前一组的开始/结束时间。在各种风暴条件下验证算法的性能。结果表明该算法可以在不超过网格码中的不超过所需的斜坡速率的情况下关闭WPP。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号