Method for laying of a cable in an off-shore situation of a wind energy installation to a destination and wind power plant for arrangement in an off-shore situation
Method for laying of a cable in an off-shore situation of a wind energy installation to a destination and wind power plant for arrangement in an off-shore situation
展开▼
机译:在风能设备的离岸情况下将电缆敷设到目的地的方法和风力发电场以布置在离岸情况下
展开▼
页面导航
摘要
著录项
相似文献
摘要
A method for laying of a cable in an off-shore situation of a wind energy plant (1) to a destination, such as a second wind energy plant (2) or a cable assembly point (46), wherein the cable (7) on the wind energy plant (1) is arranged in a treatment device true, provides that the treatment device true with the cable (7) on the wind energy plant (1) with an underwater vessel (18) is received, that the treatment device true under continuous laying of the cable (7) with the underwater vehicle (18) is transported to the destination, and in that the cable (7) provided for this purpose in a cable duct (27) is introduced at the destination.For a wind energy plant (1) for arrangement in an off-shore situation, it is provided that the wind energy plant (1) a removable treatment device true for a cable (7) for connection to a destination, in the treatment device true a to the wind energy plant (1) and cable (7) for connection to the destination is arranged.
展开▼