首页> 外文期刊>Engineering Geology >The 28 October 1996 landslide and analysis of the stability of the current Huashiban slope at the Liangjiaren Hydropower Station, Southwest China
【24h】

The 28 October 1996 landslide and analysis of the stability of the current Huashiban slope at the Liangjiaren Hydropower Station, Southwest China

机译:1996年10月28日的滑坡和西南梁家仁水电站目前华石板斜坡的稳定性分析

获取原文
获取原文并翻译 | 示例
           

摘要

On 28 October 1996, a landslide occurred on the Huashiban slope near the Liangjiaren Hydropower Station.The landslide was caused by a failure mechanism induced by an earthquake (Mw 7.0) at Lijiang on 3February 1996, after which a tensile fracture zone formed on the Huashiban slope. The subsequent impact ofseveral small earthquakes on the slope increased the tension crack connectivity and the tensile strengthgradually decreased. Severe rainfall in the rainy season between May and October, especially in July andAugust, decreased the shear strength of the bottom sliding surface, resulting in a landslide on the Huashibanslope on 28 October 1996. The stability of the Huashiban slope is important for plant site selection. If afurther landslide occurs on the slope, the Liangjiaren Hydropower Station project will be critically affected,so analysis of the current slope stability is extremely important. At present, the Huashiban slope can bedivided into five subzones: (1) a landslide deposit zone; (2) a landslide zone; (3) a tensile fracture zone; (4)a crescent-shaped zone; and (5) an upper slide zone. Using historic landslide data for 28 October 1996,retrospective analysis of the landslide process revealed shear strength parameters for the Huashiban slope.The cohesion strength is 0.024 MPa, the friction angle at the bottom sliding surface is 14°, and the tensioncrack connectivity is 50%. These parameters were used to compute the stability of the Huashiban slope:Under the same conditions, the stability of the whole slope is better than that of part of the slope, and theoverall stability is dominated by the tensile fracture zone. Under earthquake and rainfall conditions, it ispossible that failure will occur in the tensile fracture zone. Thus, the Huashiban slope should be reinforcedfor construction and operation of the Liangjiaren Hydropower Station.
机译:1996年10月28日,梁家仁水电站附近的花石板斜坡发生了滑坡,是由1996年2月3日丽江7.0级地震引起的破坏机制引起的,其后在花石板上形成了拉伸断裂带。坡。随后几次小地震对边坡的影响增加了拉力裂缝的连通性,拉力强度逐渐降低。 5月至10月(特别是7月和8月)雨季的强降雨使底部滑动面的抗剪强度降低,1996年10月28日在花石板坡发生滑坡。花石板坡的稳定性对于植物选址很重要。 。如果边坡再发生滑坡,梁家仁水电站工程将受到严重影响,因此对当前边坡稳定性的分析非常重要。目前,花石板斜坡可分为五个分区:(1)滑坡沉积带; (2)滑坡带; (3)拉伸断裂带; (4)月牙形区域; (5)上部滑动区。利用1996年10月28日的历史滑坡数据,对滑石过程的回顾分析揭示了花石板斜坡的抗剪强度参数。内聚强度为0.024 MPa,底部滑动表面的摩擦角为14°,张裂裂纹的连接度为50% 。这些参数用于计算花石板边坡的稳定性:在相同条件下,整个边坡的稳定性要好于部分边坡的稳定性,总体稳定性以拉伸断裂带为主。在地震和降雨条件下,可能会在拉伸断裂区发生破坏。因此,梁家仁水电站的建设和运营应加强花石板斜坡。

著录项

相似文献

  • 外文文献
  • 中文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号