首页> 外文期刊>Engineering failure analysis >Failure analysis of increased rail wear of 200 tons foundry crane track
【24h】

Failure analysis of increased rail wear of 200 tons foundry crane track

机译:200吨铸造起重机履带钢轨磨损增加的失效分析

获取原文
获取原文并翻译 | 示例
           

摘要

The bridge cranes belong among the most often used machines designed for heavy loads handling. The steel supporting structure of these cranes or some specific parts of the bridge crane's construction are exposed to an excessive loading during the crane operation. The crane track, which enables travelling of the crane on the rails, is one of the most loaded and most worn parts of the bridge crane. Therefore it is necessary to perform a periodical control and maintenance of the crane track in order to avoid excessive wear of it. There are arising various negative occurrences during the crane operation if the maintenance of the crane track is neglected. The crane skewing is a very serious and negative phenomenon, which is occurring during the bridge crane operation. This phenomenon is able to cause a wheel lock of the crane or even a fall-out of the crane travel mechanism from the crane track. There is described in this article analysis of the crane skewing process on the crane track during a real crane operation. Experimental measurements, together with computer simulation are the main analytical tools applied in this work. (C) 2016 Elsevier Ltd. All rights reserved.
机译:桥式起重机属于最常用于重载处理的机器。这些起重机的钢制支撑结构或桥式起重机结构的某些特定部分在起重机操作过程中承受的载荷过大。起重机轨道是桥式起重机最重,最易磨损的部分之一,它使起重机能够在轨道上行驶。因此,有必要对起重机履带进行定期控制和维护,以避免过度磨损。如果忽略了起重机履带的维护,则在起重机操作过程中会出现各种负面事件。起重机的偏斜是非常严重的负面现象,这种现象在桥式起重机操作过程中会发生。这种现象能够引起起重机的车轮锁定,或者甚至导致起重机行进机构从起重机轨道脱落。本文介绍了在实际起重机操作过程中对起重机轨道上的起重机偏斜过程的分析。实验测量以及计算机模拟是这项工作中应用的主要分析工具。 (C)2016 Elsevier Ltd.保留所有权利。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号